SUB FLOOR PACKAGE

Do you need help getting your dream home out of the ground?

Starting any new build, and getting it out of the ground can be very daunting task,even for the most experienced, but it is vital to get the first stage done right. Burke construction can take the stress  away from you by liasing with Architects, building control and other relevant authorities to get your dream home to sub floor level, with all foul and storm drainage installed. At this point it gives you the opportunity to carry on with the build your self at your own pace or alternatively we can give you a quotation for further work.

SUB FLOOR PACKAGE​

Site Survey and Set Out
Site Clearance
Foundations – Excavated and concrete laid
Footings – Built and back filled
Sub Floor installation: Pre cast Slab or On Situ Concrete Slabs
Installation of Storm & Foul Drainage - Septic / water treatment tanks - Water and service Ducts